Issue: The facility required an overflow parking lot in order to provide additional spaces for their ever growing employee base. They stipulated a 76 space minimum, the new lot's location, and a wish to keep costs low.
Solution: Pave South sent their surveyor to assess the initial site conditions and conduct a topographical survey. The site was designed in-house and the area of the parking lot was kept under 1 acre in order to avoid site disturbance permitting and keep costs low. We were also able to design the lot with 79 spaces, giving the facility a few more parking spaces than their minimum.
The asphalt was install
And the lot was striped per the customer's specifications.